Engineering/Road Construction
County Road 1 Rehabilitation - Concrete Overlay - see one pager STAGE 2 DETOUR MAP (Begins 6/20/22)
Location: Between Sibley County and 1500' east of CR 22 (2 miles SW of Lester Prairie)
Anticipated Start of Construction: 5/2/22
Anticipated Open to Traffic: August 12
Contractor: Croell, Inc., New Hampton, IA
Location: Between Sibley County and 1500' east of CR 22 (2 miles SW of Lester Prairie)
Anticipated Start of Construction: 5/2/22
Anticipated Open to Traffic: August 12
Contractor: Croell, Inc., New Hampton, IA
During construction the road will be closed to all thru traffic, but access will be maintained for individuals living along or doing business along the road. There will be a detour established.
The project is funded with Federal and State Aid funds.
COUNTY ROAD 1 CONSTRUCTION UPDATE (8/11/22)
The Contractor is performing minor cleanup. The road is scheduled to open 8/12/22.
CR 15 (Morningside Ave) Reconstruction
Location: Between 11th Street and 16th Street in Glencoe
Anticipated Start of Construction: July 27, 2020
Anticipated Open to Traffic: Project is open to traffic. There is minor work remaining.
Contractor: Duininck, Inc., Prinsburg, MN
Anticipated Start of Construction: July 27, 2020
Anticipated Open to Traffic: Project is open to traffic. There is minor work remaining.
Contractor: Duininck, Inc., Prinsburg, MN
This project includes the removal of existing pavement, subsurface soils corrections, horizontal and vertical curve adjustments, installation of a new railroad crossing, construction of a new roundabout at 16th Street and new bituminous pavement. During construction the road will be closed to all thru traffic, but access will be maintained for individuals living along or doing business along the road. The project is funded with a combination of State Bonding, Municipal and County State Aid, and City funds.
August 21, 2020: Project is underway, see updates below.
072920 Update 1 090420 Update 6 101220 Update 11 050421 Update 16 100621 Update 20
080720 Update 2 091120 Update 7 101920 Update 12 062221 Update 17 110921 Update 21
081720 Update 3 091820 Update 8 102320 Update 13 071421 Update 18 1201221 Update 22
082120 Update 4 092520 Update 9 110220 Update 14 091521 Update 19 0622022 Update 23
082820 Update 5 100520 Update 10 111620 Update 15-Final for season
072920 Update 1 090420 Update 6 101220 Update 11 050421 Update 16 100621 Update 20
080720 Update 2 091120 Update 7 101920 Update 12 062221 Update 17 110921 Update 21
081720 Update 3 091820 Update 8 102320 Update 13 071421 Update 18 1201221 Update 22
082120 Update 4 092520 Update 9 110220 Update 14 091521 Update 19 0622022 Update 23
082820 Update 5 100520 Update 10 111620 Update 15-Final for season
2022 Seal Coat
Location: Various County Roads - See MAP
Location: Various County Roads - See MAP
Anticipated Start of Construction: Construction is scheduled to start August 9, 2022.
Anticipated Open to Traffic: No road closures, traffic will be directed with pilot cars and should expect minor delays.
Contractor: Asphalt Preservation Company, Detroit Lakes, MN
Anticipated Open to Traffic: No road closures, traffic will be directed with pilot cars and should expect minor delays.
Contractor: Asphalt Preservation Company, Detroit Lakes, MN
The 2022 Seal Coat contract includes seal coating and pavement marking on 18.5 miles of the following County Roads: 7, 8, 76, 111, 15 (Morningside) and 180th (west of S Grade Road). The project includes pavement marking on various other County Roads.
The project is funded with Local funds.
The project is funded with Local funds.
6" Pavement Marking
Location: Various County Roads
Location: Various County Roads
Anticipated Start of Construction: Flexible start date between August 15 and October 15, project has a maximum of 10 days to be completed.
Anticipated Open to Traffic: No road closures
Contractor: TBD
Anticipated Open to Traffic: No road closures
Contractor: TBD
This project includes 6" pavement marking on various County Roads.
The project is funded with Federal Safety Funds (HSIP) and Local funds.
The project is funded with Federal Safety Funds (HSIP) and Local funds.
Bridge 43515 - Deck Overlay (CR 71 at S Fork Crow River)
Location: 0.2 miles N of TH 22 (over S Fork Crow)
Location: 0.2 miles N of TH 22 (over S Fork Crow)
Anticipated Start of Construction: TBD, likely DELAYED until 2022
Anticipated Open to Traffic: Road will be closed, project duration is approximately 10 days.
Contractor: TBD
Anticipated Open to Traffic: Road will be closed, project duration is approximately 10 days.
Contractor: TBD
The project involves removing the top portion of the bridge driving surface and replacing with new a new concrete driving surface.
The project is funded with Local funds.
The project is funded with Local funds.
Bridge L2940 Replacement - Acoma Twp
Location: 200th Street in Acoma Twp over S Fork Crow River
Location: 200th Street in Acoma Twp over S Fork Crow River
Anticipated Start of Construction: June 13
Anticipated Open to Traffic: Project has 65 Working Days, anticipated opening would be November or December. Road will be closed, no detour will be posted, local traffic should plan on other routes.
Contractor: Structural Specialties, Hutchinson, MN
Anticipated Open to Traffic: Project has 65 Working Days, anticipated opening would be November or December. Road will be closed, no detour will be posted, local traffic should plan on other routes.
Contractor: Structural Specialties, Hutchinson, MN
The project involves replacing the timber bridge with a concrete slab span bridge.
The project is funded with Town Bridge funds and Township funds.
The project is funded with Town Bridge funds and Township funds.
Bridge Deck Maintenance - various bridges
Location: Various County Roads
Location: Various County Roads
Anticipated Start of Construction: TBD, likely June - October
Anticipated Open to Traffic: No road closures anticipated, bridges will be done half at a time, traffic should expect minor delays.
Contractor: TBD
Anticipated Open to Traffic: No road closures anticipated, bridges will be done half at a time, traffic should expect minor delays.
Contractor: TBD
The project involves sealing cracks on the bridge driving surface.
The project is funded with Local funds.
The project is funded with Local funds.